Dehydrated onion processing inside a selected partner facility

Production coordination & quality

Production Coordination & Processing

Green Apple coordinates the production of dehydrated onion, garlic and leek through selected qualified processing facilities in Egypt, matching each order to the required specification, production capability, quality requirements, packaging format and delivery schedule.

Production coordination & quality

How Production Is Coordinated

Sourcing, inspection, dehydration, sorting, packaging and export — carried out at selected partner facilities, with Green Apple quality oversight and export coordination.

  1. Sourcing
    01

    Sourcing

    Raw materials are sourced through approved agricultural and supply channels according to the required product specification, quality criteria and production plan.

  2. Inspection
    02

    Inspection

    Incoming raw materials are inspected and sorted at the selected partner facility to confirm suitability for processing against the agreed product requirements.

  3. Dehydration
    03

    Dehydration

    Dehydration is carried out at the selected partner facility under controlled processing conditions according to the agreed product specification. Drying parameters, including temperature and moisture targets, are monitored according to the applicable product specification and facility procedures.

  4. Sorting & Safety
    04

    Sorting & Safety

    Screening, optical sorting, foreign-matter controls and metal detection are carried out at the selected partner facility according to the agreed specification and applicable food-safety procedures. Green Apple coordinates quality oversight and documentation against the agreed customer and shipment requirements.

  5. Packaging
    05

    Packaging

    Packaging options may include multi-wall Kraft paper bags with food-grade PE liners, 20/25 kg bags, jumbo bags, cartons or customer-specific formats, depending on the selected product, facility capability and order requirements.

  6. Container Loading
    06

    Container Loading

    Container condition, loading arrangement, desiccant use where required, palletisation and cargo securing are coordinated according to shipment requirements.

Certifications

Our 4-Stage Quality Assurance Protocol

  1. 01

    Facility Qualification & Order Matching

    Before production is assigned, Green Apple evaluates the requirements of the order and matches them with a suitable qualified processing facility. The selection considers factors such as:

    • Product and required cut or particle size.
    • Technical specification and quality parameters.
    • Relevant food-safety and certification requirements.
    • Production capability and available capacity.
    • Packaging format.
    • Delivery schedule and destination-market requirements.

    Production is therefore allocated according to the requirements of the specific order rather than being automatically tied to one plant.

  2. 02

    Pre-Production Specification Alignment

    Before production begins, the agreed commercial and technical requirements are coordinated with the selected facility. This may include:

    • Approved product specification or TDS.
    • Moisture and physical requirements.
    • Packaging and labeling requirements.
    • Batch identification and traceability expectations.
    • Testing and documentation requirements.
    • Shipment and delivery conditions.

    The objective is to establish a clear specification reference before production starts.

  3. 03

    Production & Quality Oversight

    During processing, Green Apple coordinates the relevant quality checkpoints for the order. Depending on the product and selected facility, this may include review or supervision of:

    • Raw material condition.
    • Drying and moisture parameters.
    • Screening and grading.
    • Optical sorting and foreign matter controls.
    • Batch traceability.
    • Final product condition before packing.
    • Sampling and laboratory testing requirements.

    This provides an additional independent layer of quality coordination between the buyer’s requirements and the selected production facility.

  4. 04

    Final Release, Packing & Loading Coordination

    Before shipment, Green Apple coordinates the final order checks and export-readiness steps relevant to the agreed shipment. These may include:

    • Final packaging verification.
    • Label and batch-data review.
    • COA and required supporting documentation.
    • Random or agreed pre-shipment sampling.
    • Container cleanliness, dryness and suitability inspection.
    • Loading coordination.
    • Container and seal-number recording.

    This process helps maintain continuity from the agreed specification through production, packing and final container loading.

Our multi-facility model is designed to provide production flexibility without removing accountability: each order is matched, coordinated and followed according to its specific technical, quality and logistical requirements.

Quality inspection supporting an agreed dehydrated-product specification

Certifications

Professional Container Inspection & Cargo Loading

Quality controls are coordinated against the agreed product specification, including relevant moisture, sorting, metal-detection and foreign-matter checks at the selected partner facility.

Relevant technical documentation may include product specifications covering cut or mesh size, moisture, microbiological criteria, packaging and shelf-life requirements.